 The following is the garment industry Merchandiser:
Merchandiser out during the live, work, pay attention to conditioning and orderly, in particular, to ensure personal safety, while more attention to the representatives of the corporate image.
A daily work:
⒈ fully prepared and understand the order data (customer, documentation, production process, the final confirmation samples, surface / materials like card, confirm comments or corrections, special circumstances can be carried off like), to grasp all the information to confirm the production process between whether the details of a unified and detailed. For detailed instructions on matters not clearly reflect to the relevant technical department and the business unit for timely confirmation.
⒉ and outside the company must ensure that all requirements and information processing between the detailed and clear, consistent! ( better to have written proof)
⒊ learn as much as possible in advance of the processing plant production, plant operating conditions and the advantages / disadvantages of a full assessment, do know too much.
⒋ Merchandiser behavior, attitude both on behalf of the company, so deal with the various business units in the appropriate course of business shall be to grasp the basic principles of appropriate attention to words and actions, attitudes, reasonable manner. is prohibited by any subjective or objective reasons for the customer (or client company Merchandiser) are radical words and deeds. treatment course of business, can not arbitrarily override position, the company decided to consult a problem in a timely manner.
⒌ work in advance to fully assess the potential occurrence of the problem, corresponding to strengthen efforts to improve the detailed preparatory work to reduce or eliminate the possibility of its occurrence . not to find problems for the purpose of pre adequately protect, identify duplication of work, the timely processing of the issue and review our experience, methods and details of future work to further improve the party as a fundamental way.
6. Merchandiser orders and order responsible person (operator) to maintain close contact, for the interests of both sides, two with each other to communicate the problem to a minimum.
Second, the production process of inspection procedures:
⒈ surface / materials to the plants, plant the shortest possible time under the supervision and detailed inventory of the invoice, receipt by the factory. If there is a short code / less personally involved in the phenomenon to be counted and confirmed.
⒉ not played previous samples, such as factories, to be arrangements before the commissioning of its liquid samples to confirm played, and factory inspection results in writing and the plant is responsible for technical subjects. special circumstances to be submitted to the Company or the Customer acknowledges that the rectification is correct before production.
⒊ proof behind the factory cutting patterns can confirm its version of a long, detailed records of consumption confirmation by the factory manager to sign, and inform the open cut.
⒋ confirmation of consumption depends on both the factory to check with the face / accessories overflow missing values, and specific written notice to company data. If less material to be fed timely implementation issues and inform plants. if I will have to inform the factory overflow after the goods returned to Division I, and urge them to conserve and eliminate waste.
⒌ must initially be put into each workshop, each procedure carried out semi-finished products of high standards of inspection, if there are questions to reflect the plant is responsible for timely and appropriate management and supervision, to assist factories and implement improvement.
⒍ each plant after the plane first piece of finished products to its size, workmanship, style, a full detailed inspection process. issued by the inspection report (goods production early / mid / late) and the rectification, by the processing plant is responsible for people left the factory after the signing of a confirmation, the company retained a copy and fax.
⒎ records every day, summing up the work to develop the program of work tomorrow. According to the prior delivery of the goods listed in the production schedule, daily detailed records plant cutting schedule, production schedule, the situation of finished products, the number of production machines, according to the progress of the production schedule and supervise the implementation of the factory. production progress report to the company at any time.
⒏ Merchandiser for customer inspection to the factory or company proposed production, quality requirements, to supervise, assist in processing plants are in place, and timely reporting of implementation.
⒐ finishing products into the shop, workers need to always check the actual operation of the ironing, packaging quality, and from time to time testing packaged products, there are problems to do early detection and early treatment. make every effort to ensure the goods quality and delivery.
⒑ After packing the goods, to cutting and packing list to check the details, check Every color, every number are matched. If the problem causes must be identified and promptly resolved accordingly.
⒒ processing after the clean up and recover all the remaining details of fabric, accessories.
⒓ on various aspects of the production process (including the corresponding departments of the Company and each business unit) with the synergy efforts, problems, the response of the problem and the entire order processing operation to summarize the report in writing to the competent leadership of the company.
13. in the examination process must to be fair and objective. not receive the benefits of a little factory, forgetting their duties.
1) to have better language foundation, acquire a certain amount of professional foreign language, while at least (fabric / garment) production process a fundamental understanding of: receiving orders - preparation - open cut - sweeping powder (if any flowers or beading car) / floral arrangements (in the case lace floral arrangements section) - Sewing - hand - after the whole - check cargo - packed so.
2) orders: customers clearly understand the different sample styles and style needs, with customer orders at the time, and can find some of the production problems that may arise, customer acceptance is both induced by the unique style but his product suitable for mass production of products (Note: too difficult and not generally a good facility to go to, then no doubt greatly increased the cost of production hh), the requirements of the customer clearly marked on the organizers.
3) cloth production: A. Let the master do figure pattern issued at the same time arrangements for preparation, careful to do to follow up the progress of each process and record each of the production problems encountered in the process, need to note, the amount of each material and the manufacturing process in cost accounting work for basic information.
4) see to do: sample completed, the designer watch you do the factory (the merchandiser for the early entry is important, you can learn some technical stuff) to see whether this office have to do if you learned from customers like he wanted to do.
5) cost data: sample sent to the customer have to do after the filing and cost data to the customer offer, this one needs special care seriously. We all know that there is some wrong, or if the cost quoted errors, this paragraph would have the goods after the great loss of hh
with the production of goods requires:
1) have better language foundation acquire a certain amount of professional foreign language, at least for the garment production processes also have a fundamental understanding of: receiving orders - preparation - open cut - sweeping powder (if any flowers or beading car) / floral arrangements (the case of lace row Patterns ) - Sewing - hand - finishing - check order - Packaging
2) orders: special attention to good convergence with the appropriate style to do my colleagues to do when doing this part of the archived data ---- work was particularly carefully, such as: when do do do, the customer has requested additional changes to the practice of large goods.
3) cloth production: the production of single-and the process to do when doing the problems, modify the method views of their clients the information and distributed to the appropriate process.
4) follow-up production: more than walk to the workshop, managers learn to all process sections of the goods produced species in the problems encountered, such as necessary, to customers of the problem and need advice or comments hh
5) delivery and quality: the same time with the purchase of good quality control to make QC hh
6) shipment packing list information: the need to provide advance out of the box to the shipping department installed a single data used for customs information hh
7) packaging and shipping: Under normal circumstances, different customers have different marks, position marks car method, packaging information. according to customer requirements to do on it All Rights hh
1, Head Office: design drawings made outside the plant on the front page, front page size and plate approval (and designers together), if confirmed, must continue to do re-edition.
2, confirmed Production models: Order the budget to do surface materials purchasing department ordered a single cross.
3, baking accessories: billing baking accessories (CMT not made a single fabric)
4, prenatal version: materials with large cargo plane (If no materials can be temporarily, subject to the clearly marked) to do the right prenatal Office, Office and approved recovery (including technology, size, materials, styles, etc., in short, before the kind of large goods).
5, production schedule and quality of follow-up to ensure delivery and quality: Open the CD, the CD number, the initial inspection, interim inspection, the tail of the inspection, delivery, return the main accessories liquidation. the middle to solve various production problems, problems of each part is easy constantly reminded to check. If the number of more or less cut, and material and fixed term replacement, FOB single on the number of outside the normal acceptable range: the number to no more than that, then do not accept less quantity, the quality of three how to solve the problem of how to monitor, how to address late delivery, etc..
expertise with the single addition, there is the factory should pay attention to and deal with the relationship, this is a very important key
with a single The steps include: prenatal kind of confirmation, the ship kind of validation, production, factories and companies in the interface between the communication quality of identification of raw materials, production technology, product packaging, delivery and follow-up period, with the reminder, and so on, In short the whole process including production.
with the single there is a business with a single, mostly for foreign trade companies, on the technical knowledge requirements are not too high, mainly responsible for the production plants and guests to contact and arrange shipping methods and schedules, payment and so on. Of course, the fabric (clothing) quality is also important.
with the general process within the single is as follows: from the customer order to complete the contract signed, according to nesting room layout diagram provided preparations for pre-fabric, and can proceed to the next production information sheet to various departments (including the plan to do, quality department, technology department, purchasing department). fabric to the factory after the actual situation according to the factory to the shop Keep track of the progress of production in order to Better communication with customers, and in a timely manner so that the guests understand the bulk plant operating conditions, to prepare in the event of special circumstances (such as the delivery is not timely, not timely delivery, etc.) so that guests get the message the first time, to avoid Guests booked in advance or air shipment, due to return to the plant warehouse is not timely and unnecessary losses.
with a single note:
1: the material is correct.
2: size is : whether the material to processing plants on schedule.
8: Are there problems in time.
all acts on behalf of the employees throughout the company's corporate image, whether from the individual words and deeds, or doing things, the importance of personal and corporate image is very important. on the company to be faithful, not for personal benefit, sold the company. Merchandiser out during the live, work pay attention to conditioning and orderly, in particular, to ensure personal safety, while more attention to the representatives of the corporate image